Mivan Telecoms is now designing and building sites all over the UK, from Inner London to the Highlands of Scotland.
Listed building, Hatton Garden, London, had twice been turned down by the planner but Mivan’s innovative stealth solution was not only approved but commended by the planners. Another form of camouflaged design solution was developed for Orange at a North Wales listed ruin. The reinforced concrete castellated turret hides the plant and cabins while the antennae are built into the recesses. The virtually inaccessible site location of a hillside above Loch Lomond didn’t stop Mivan from building there. With over 60 helicopter lifts (see above picture) this difficult site was constructed in the record time of 2 days. « Go Back